Mining Wastewater Treatment
Acid mine drainage, tailings water, and ore-washing effluent — engineered systems that remove solids and meet discharge limits
Mine Effluent Is Acidic, Solids-Laden, and High-Volume
Acid mine drainage, tailings water, and ore-washing effluent carry heavy suspended solids, dissolved metals, and — in sulfide mines — low pH. Discharging it untreated risks fines, equipment corrosion, and damage to receiving waters.
A Complete Treatment Line, Engineered to Order
From grit removal to sludge dewatering, every stage is sized to your flow and discharge target.
1 · Grit & Screening
Remove coarse rock, sand, and debris before they damage pumps and downstream units.
2 · Neutralization
pH adjustment and metal precipitation convert dissolved metals into settleable solids.
3 · DAF Clarification
Dissolved air flotation removes fine suspended solids and precipitated metals.
4 · Sludge Dewatering
Belt or screw press dewaters the metal-laden sludge for safe, low-cost disposal.
The Two Machines That Do the Heavy Lifting
Dissolved Air Flotation (DAF) System
After neutralization, DAF floats out the fine tailings and precipitated metals that settle too slowly on their own — a compact, high-rate solid-liquid separation step.
Sludge Dewatering Systems
The tailings and precipitated metals removed by treatment become a heavy sludge. Dewater it on-site to cut haulage and tailings-storage costs.
Typical System Configurations
Reference line-ups by scale — the final design depends on your flow and discharge target.
Small · Ore Washing
≤ 100 m³/d
Grit removal + neutralization + DAF-30 + sludge dewatering.
Medium · Tailings Water
100–500 m³/d
Grit removal + neutralization + DAF-100 + sludge dewatering.
Large · Acid Mine Drainage
> 500 m³/d
Grit removal + neutralization + DAF-200 + clarification + sludge dewatering.
Engineered in China's Environmental Machinery Base
Engineered-to-Order
Designed around your flow, inlet parameters, and site constraints — never off-the-shelf.
ISO 9001 · CE Marked
Certified manufacturing with pre-shipment testing and third-party inspection welcomed.
Exporting to 50+ Countries
Export-grade crating and FCL/LCL logistics from a factory near Qingdao Port.
Get a Mining Wastewater Solution Proposal
Send us your flow and inlet parameters, and our engineers will return a recommended configuration and budget within 24 hours.
Phone / WhatsApp
+86 18765146311Factory Address
Zhucheng City, Shandong Province, China 262200Prefer WhatsApp?
For fastest response, message us directly on WhatsApp. We typically reply within minutes during business hours (UTC+8).
Chat on WhatsApp →Request a Quotation
We typically respond within 12 hours on business days.